produtos
detalhes dos produtos
Casa > produtos >
EC360 Front Idler 14520609, idler wheel with integral forging for EC360 excavator undercarriage daily replacement

EC360 Front Idler 14520609, idler wheel with integral forging for EC360 excavator undercarriage daily replacement

Quantidade mínima: 1PCS
Preço: US$102-220
Embalagem Padrão: Embalagem padrão para exportação
Período de entrega: 7-15 dias
Método de pagamento: T/T,L/C
Capacidade de fornecimento: 10.000 unidades/meses
Informações pormenorizadas
Lugar de origem
China
Marca
ZTMC
Certificação
ISO9001
Número do modelo
EC360/EC350/EC360D/EC290
Tratamento de superfície:
Tratado termicamente e revestido
Recursos:
Durável
Cor:
Cliente amarelo ou preto obrigatório
Especificação:
100% novo
Técnica:
Forjando ou fundindo
Especificação:
Como solicitação do cliente
Descrição do produto
EC360 Front Idler 14520609
Product Overview

This 14520609 EC360 front idler is a heavy-duty undercarriage guide wheel tailored for EC360 series excavator daily maintenance and routine part replacement. Adopting professional integral forging molding craft, this part differs greatly from ordinary welded and spliced idlers on the market. The one-piece forged structure eliminates assembly gaps and structural weak points, delivering higher overall rigidity and fatigue resistance for long-duration daily excavation, earthmoving and general construction site operation.

Technical Specifications
Parameter Item Factory Standard Specification
Part Number 14520609
Applicable Equipment EC360 Series Excavator
Core Feature Integral Forged One-piece Structure
Processing Technology Integral Forging + Precision Machining + Overall Heat Treatment
Surface Hardness HRC 52-58
Structural Advantage No Weld Joints, High Impact Resistance
Dimensional Tolerance ±0.02mm
Application Daily Undercarriage Replacement & Site Operation
Differentiated Forging Quality Control

Most budget replacement idlers use split welding or secondary assembly, which easily cause joint cracking, loosening and premature failure after long working hours. Our 14520609 front idler adopts complete integral forging forming with no welding seams, ensuring unified internal metal density. Each finished product passes ultrasonic nondestructive testing, hardness uniformity inspection and high-precision dimension calibration.

Core Product Advantages
  • Seamless Integral Forged Structure: One-piece forming eliminates hidden troubles of welding cracks and loose splicing, improving overall structural stability under frequent load changes.
  • Optimized Heat Treatment: Balanced hardness and toughness effectively resist daily friction, minor impact and track shaking wear, extending service life.
  • Standard Dimension Matching: Fully compliant with 14520609 installation standards, supporting direct bolt-on replacement, saving maintenance time and labor cost.
  • Industrial Batch Stability: Standardized production and full-item testing ensure consistent quality of each batch, suitable for engineering fleet long-term replacement.
Application & Packaging Service

This 14520609 front track idler is ideal for EC360 series excavator daily undercarriage overhaul and routine part replacement, adapting to earthwork, road construction and general engineering scenarios. All products are treated with anti-rust protection, waterproof film wrapping and reinforced wooden box packaging for safe long-distance sea shipping.

EC360 Front Idler 14520609 - Product overview showing the heavy-duty construction EC360 Front Idler 14520609 - Detailed view of the integral forged structure